Zhengzhou International Commodity Trading Center (Phase I)
source: Updated:21/3/2025

  Project:Zhengzhou International Bulk Commodities Trading Center (Phase I) 

  Details:The project covers an area of approximately 15,000 mu (about 10,000 hectares), with the first phase occupying 1,516 mu (about 1,011 hectares). The total construction area is 560,000 square meters. The main components include a national fertilizer reserve warehouse (137,700 square meters), a comprehensive agricultural production materials reserve warehouse (231,800 square meters), a grain reserve warehouse (32,600 square meters), a frozen and refrigerated warehouse (19,300 square meters), a constant temperature warehouse (19,300 square meters), a cargo shed (14,500 square meters), and supporting warehouse buildings (98,800 square meters). Additionally, the project will include the construction of a dedicated railway line (with four tracks) and a transfer station with an area of approximately 335,800 square meters.

  Total Investment (Unit: 10,000 Yuan):477,976.15

  Construction Entity:Zhengzhou Airport Logistics Construction Co., Ltd

  Proposed Methods for Attracting Private Capital: Private capital participation, and cooperative operation

  Contact:Wang Quan

  Tel:15738868688